• News
  • Services
  • Modernization
  • Featured Projects
  • Work In Progress
  • About Us
  • Contact
Menu

Neubauer Electric

11072 Via El Mercado
Los Alamitos, CA, 90720
(714) 897-7000
Neubauer Electric Inc

Your Custom Text Here

Neubauer Electric

  • News
  • Services
  • Modernization
  • Featured Projects
  • Work In Progress
  • About Us
  • Contact

POLB Pier C Heavy Duty Truck Charging Center

2.jpg
1.jpg
3.jpg
4.jpg
5.jpg

Crenshaw High School

3.jpg
5.jpg
4.jpg
9.jpg
8.jpg
7.jpg
1.jpg
10.jpg
6.jpg
11.jpg
2.jpg

CSULB Anna W. Ngai Alumni Center

1.jpg
3.jpg
4.jpg
5.jpg
6.jpg
7.jpg
8.jpg

Port of Long Beach Fire Station #15

New construction of Fire Station and Boat House. Photos courtesy of the Port of Long Beach

5.jpg
1.jpg
7.jpg
2.jpg
6.jpg
4.jpg
3.jpg
8.jpg
9.jpg
boat+house.jpg
station2.jpg
boathouse2.jpg
station1.jpg
boathouse 4.jpg
boathouse 5.jpg

LA Southwest College School of Science & Math

Design-Build two story Science & Math building at LA Southwest College. Onsite generator backup and BMS integration for full infrastructure control.

1.jpg
2.jpg
laswc3.jpg
laswc8.jpg
laswc6.jpg
laswc4.jpg
laswc23.jpg
laswc22.jpg
laswc20.jpg
laswc16.jpg
laswc14.jpg
laswc13.jpg

Santa Monica College Student Services

The Santa Monica College Student Services project features new construction of a 3 story, 100,000 square foot building. Below the 3 stories of administrative space is a 3 story 500 car parking garage with electric vehicle charging stations. The administrative space is a campus hub for students for enrollment services and features a auditorium with theatrical lighting. The roof was fitted with a photo-voltaic panels for efficient energy consumption.

Photo May 03, 11 29 30 AM.jpg
outside.jpg
Photo May 30, 10 02 07 AM (1).jpg
Photo May 24, 10 38 43 AM.jpg
Photo May 03, 11 30 38 AM.jpg
Photo May 03, 11 29 54 AM.jpg
Photo May 03, 11 28 25 AM.jpg
Photo Mar 28, 9 26 28 AM (1).jpg
Photo Jun 27, 11 34 47 AM.jpg
solar.jpg
Photo May 30, 10 07 18 AM.jpg
Photo May 30, 10 07 48 AM.jpg
Photo Jun 27, 11 31 00 AM.jpg
Photo Jun 27, 11 31 11 AM.jpg
Photo Jun 27, 11 24 47 AM.jpg
Photo Jun 27, 11 29 33 AM.jpg
Photo Jun 27, 11 29 10 AM.jpg

Patton State Hospital

Construction of a new 36,000 square foot facility in Patton, CA. The new facility encompassed a new kitchen, high capacity food storage, with drive in refrigerators and freezers. The infrastructure included key card access, Personal Duress Alarm System (PDSA), closer circuit television (CCTV), and a diesel backup generator. In addition to the new building, remodeling of 7 existing satellite kitchens in 5 separate buildings was completed.

front.jpg
front1.jpg
Photo Jul 01, 10 59 47 AM.jpg
Photo Jul 01, 11 04 09 AM.jpg
Photo Jul 01, 11 03 33 AM.jpg
Photo Jul 01, 11 02 53 AM.jpg
Photo Jul 01, 11 01 06 AM.jpg
Photo Jun 07, 12 24 10 PM.jpg
Photo Jun 07, 11 54 26 AM.jpg
Photo Jul 01, 11 12 58 AM.jpg
Photo Jul 01, 11 08 32 AM.jpg
electric room.jpg

Golden West College Student Services

Construction of a new 52,000 sqft Student Services building located central to campus. Relocated the existing MDF room to the new facility. The building was constructed to LEED Silver standards. 

IMG_2328.jpg
IMG_2331.jpg
IMG_2332.jpg
IMG_2336.jpg
IMG_2334.jpg
IMG_2343.JPG
IMG_2337.jpg
IMG_2329.jpg

Maywood Center for Enriched Studies

9 acre new construction project for LAUSD. Project consisted of 7 multi level buildings which included Multipurpose room with theatrical lighting, parking structure with rooftop basketball court, 3 classroom buildings, football stadium and landscape lighting.  

IMG_6926.jpg
IMG_0964[1].JPG
IMG_0965[1].JPG
IMG_0952[1].JPG
IMG_6929.jpg

Port of Los Angeles, TraPac Terminal Berth 136-139 & 145-147

Berths 136-139 & 145-147, operated by TraPac Inc, are located in the Port of Los Angeles. The project included the construction of a 4 story administration building designed to achieve LEED Gold certification. The roof top included integrated solar panel installation. The remaining 170 acre site included construction of a 8 bay drive thru truck scale, yard operations building, pedestrian bridge over the railway and renovation of the site underground utilities.  

IMG_1921.JPG
IMG_1923.JPG
IMG_1922.JPG
IMG_1920.JPG

Santa Monica College Core Performance Center & Central Plant

The three-story, 63,750 square-foot-building was constructed to LEED Silver standards. In addition to classrooms, the new facility has a fitness center with weight room, rock climbing wall, dance studios, offices and locker rooms. The project also includes a new central plant facility that will provide chilled water to several buildings on the campus as well as thermal energy storage and renovation of an 18,880-square-feet of space in adjacent pavilion. 

IMG_1192.JPG
IMG_1193.JPG
IMG_1170.JPG
IMG_1166.jpg
IMG_1157.jpg
IMG_1152.jpg
IMG_1155.jpg
IMG_1153.jpg
IMG_1154.jpg

Hoag Hospital

The project consists of a 42,000 SF renovation to an existing campus building, including a two-story addition and expansion of the existing Emergency Department totaling 1,500 SF. New spaces include CT, MRI, RAD and a waiting room, as well as a new entrance and courtyard plaza.

HOAG_8-26 179.jpg
HOAG_8-26 170.jpg
HOAG_8-26 174.jpg
HOAG_8-26 138.jpg
HOAG_8-26 163.jpg
HOAG_8-26 160.jpg
HOAG_8-26 042.jpg
HOAG_8-26 060.jpg
HOAG_8-26 078.jpg
HOAG_8-26 108.jpg
HOAG_8-26 130.jpg
HOAG_8-26 155.jpg
prev / next
Back to Featured Projects
5
POLB Pier C Heavy Duty Truck Charging Center
11
Crenshaw High School
7
CSULB Anna W. Ngai Alumni Center
15
Port of Long Beach Fire Station #15
12
LA Southwest College School of Science & Math
Photo May 30, 10 02 07 AM (1).jpg
17
Santa Monica College Student Services
12
Patton State Hospital
IMG_2328.jpg
8
Golden West College Student Services
IMG_0965[1].jpg
5
Maywood Center for Enriched Studies
4
Port of Los Angeles, TraPac Terminal Berth 136-139 & 145-147
9
Santa Monica College Core Performance Center & Central Plant
12
Hoag Hospital

Follow us on Instagram!

Log IN